Department Ref Subject Description Technology/Knowledge Number of interns Term

KPO PUR01 Right sized sandblasting machine insourcing Sandblasting operation is mandatory in the process to clean parts from caustic leach. Our actual sandblasting machines are big with many EHS non conformities such as noise and dust.

That's why we are planning to manufacture our own right sized sandblasting machine specific for each flowline that ensures good quality and safe working conditions SolidWorks, Material Resistance, NDT, Kaizen 1 6 Months

KPO PUR02 Eliminate ceramic cores rework. Ceramic cores are parts used during wax injection to get internal complex shapes on the metallic part. These parts are purchased from external suppliers and received with many defects that need to be reworked.

Since the ceramic cores production line implementation is in progress in our Meghira business unit, we need a deep study on the ceramic cores process to eliminate defects from the beginning. Problem solving tools, ceramic material knowledge, SolidWorks, Kaizen 1 6 Months

KPO PUR03 Design and implement M38 one piece ceramic core (No JJ & HH) M38 part needs a ceramic core during wax injection to get the internal complex shape. Actually we are using a couple of ceramic cores to get that shape (JJ & HH). Due to the flatness variation between these cores, many defects appears later on metallic part especially the high positive metal. So, to eliminate defects related to ceramic cores JJ/HH, the idea is to design one piece ceramic core for M38 SolidWorks, Material Resistance, ceramic material knowledge, Kaizen 1 6 Months

KPO PUR04 Cost saving Web application Develop a web application with both front-end and back-end to:

  • Enable users to submit their ideas independently.
  • Track the progress of each idea.
  • Notify the validation team for approval.
  • Display charts and statistics (details to be determined).

Back-End:

  • Administrators can add, modify, or remove members of the validation team.
  • Administrators can add, modify, or delete static information related to ideas (such as KPIs, buildings, departments, etc.).

Front-End:

  • Each user has a unique login and password.
  • User access is restricted based on their role (access levels to be determined). Angular, Python, HTML, CSS 1 3 Months

Production PUR05 Continuous Improvement through Kaizen in Production The objective of this project is to implement Kaizen in the production department to optimize processes, reduce waste, and improve overall operational efficiency. The student will analyze current production workflows, identify areas of inefficiency, and apply Kaizen techniques for continuous improvement. By reducing non-value-added activities, the project aims to shorten lead times, improve product quality, and increase throughput.

The focus will be on waste elimination in key areas, such as:

  • Waiting Times: Reducing idle time between processes by streamlining transitions and improving process flow.
  • Defects: Enhancing quality control to reduce rework and scrap by implementing error-proofing techniques (Poka-Yoke) and more rigorous quality checks. Kaizen, PDCA, Spaghetti Diagrams, Root Cause Analysis, Factor Tree Analysis 6 6 Months

Production PUR06 Implementation of a Production Line for a Part Number Analyze technical specifications and manufacturing requirements for the part 2462M39P02.

Design and optimize a production line that ensures consistent output and high product quality.

Identify suitable equipment and tools required for the line, considering budget and efficiency constraints.

Develop a workflow and process layout to minimize waste and improve productivity.

Implement lean manufacturing principles to reduce cycle time and enhance throughput.

Conduct testing, validation, and quality control procedures to ensure the line meets production targets and complies with industry standards. Root Cause Analysis, Value Stream Mapping (VSM),Ishikawa,SolidWorks 1 6 Months

Production PUR07 Lead Scrap Reduction Efforts with a Dynamic FTA Defect Database Create a dynamic database with an Excel application using VBA to efficiently manage and track FTA defects. Automate data analysis processes to identify trends and optimize defect resolution. Fault tree analysis

exel (VBA)

Root Cause Analysis 1 6 Months

Production PUR08 Study and design cutoff machine for parts produced Collect data on part numbers (dimensions, material, gate positions to be cut, etc.), determine the standard machine/plate size for fixture interchangeability, define functional cutting unit specifications (manual or automatic), size the dust collector and aspiration unit, and conduct a risk assessment and safety review for the machine. Design 3D/2D, RDM, SolidWorks /Catia, MS office 1 4- 6 Months

Production PUR09 Optimizing Equipment Design through 3D/2D Library Standardization Develop a standard 3D library that includes standard nomenclature, documentation, 2D templates, BOM list post-3D assembly design (including gate design), material properties (PC-15 Wax, Green Wax), and CAD tools used (ceramic rods, ceramic cups, standard metallic rods for panels). Create standard CAD models for moonshined equipment like trolleys, workstations, and boards, with a modular, right-sized solution. After standardization, implement SORT: sorting items, setting in order, shining, sustaining, and ensuring safety. Design 3D/2D , SolidWorks /Catia, MS office 1 4-6 Months

Quality PUR10 Design And Dimensioning Of a Treatment Station For Water Discharged By The Penetrant Testing Machine Sizing For The Water Circuit In a Closed Loop And Reuse It And Define The Equipment Needed For The Realization:

  • Define actual consumption
  • Create layout to put system in place
  • Hydraulic study to ensure closed loop
  • Define needed equipment Fluid mechanics

CAD 1 4-6 Months

Quality PUR11 Design And Development Of a Treatment Station For Water Discharged By The Penetrant Testing Machine Definition Of The Equipment Needed To Treat The Discharged Water And Make It Ready For Dionization:

  • Define products to be eliminated
  • Propose solution to remove coloration
  • Propose solution to dionize water
  • Implement treatment process on actual consumption EHS

Chemical 1 4-6 Months

Quality PUR12 Industrialization of product: Implementation of APQP and PPAP approaches Apply APQP/PPAP phases:

Applying APQP and PPAP phases ensures that the product development and manufacturing processes meet quality standards and customer requirements. This includes creating a Process Flow Diagram (PFD) to outline each step, using Statistical Process Control (SPC) to monitor and stabilize production, conducting Measurement Systems Analysis (MSA) to ensure accurate data, and performing Process Failure Mode and Effects Analysis (PFMEA) to identify and address potential risks. These phases work together to guarantee a high-quality product and a reliable manufacturing process. Quality tools

CAD 1 4-6 Months

Quality PUR13 Analysis and Improvement of the Manufacturing Process and Control Methods for a part number Analyse actual manufacturing process

review actual control plan

improve manufacturing process

improve inspection method to remove CMM inspection Quality tools

CAD 2 4-6 Months

EHS PUR14 Ergonomic assessment The goal of this project is to identify ergonomic risk factors at two different production sites and to develop a comprehensive action plan aimed at mitigating those risks. Ergonomics is the science of designing workplaces, products, and systems to fit the people who use them. Identifying ergonomic risks is crucial to ensuring the health, safety, and productivity of workers in a manufacturing or production environment.

The Focus Will Be On:

  • Workstation Design: Seating and posture/Desk height and layout/Tools and equipment.
  • Repetitive Motion and Manual Handling: Repetitive tasks/Heavy lifting or awkward postures.
  • Environmental Factors: Lighting/Noise levels/Temperature and ventilation.
  • Workload and Work Schedules: Overtime or long shifts/Rest breaks.

Steps:

  • Initial Data Collection and Research
  • Conduct Ergonomic Assessments
  • Analyze the Findings
  • Develop Recommendations for Improvement
  • Develop an Action Plan for Implementation Video Analysis Tools/ 3D modeling software/ Ergonomic Principles/ Workplace Design Standards/Musculoskeletal Disorders (MSDs)/ Data Analysis Skills 1 4-6 Months

EHS PUR15 Ventilation improvement This project will focus on improving the ventilation in various production environments that are exposed to high levels of dust and volatile organic compounds (VOCs), which can pose serious health and safety risks to workers. Effective ventilation is essential in minimizing the exposure to harmful particles and gases, thereby reducing the risk of respiratory illnesses, skin irritation, and other work-related diseases.

The Areas Covered By The Study Are:

  • The wax injection
  • The shell formation
  • The foundry
  • The mold cutting
  • The grinding and sandblasting

Steps:

  • Assessment of Current Conditions
  • Designing Solutions for Improved Ventilation
  • Feasibility Study: Economic and Technical Aspects
  • Develop an action plan

Fundamentals of Airflow Dynamics/ Types of Ventilation Systems/ Air Quality Monitoring/ Energy Efficiency/ HVAC Systems/ Duct Design Software 1 4-6 Months

Engineering PUR16 Standardization process for the shell mold casting Establishment of a Standard for the Shell Department

This initiative involves developing a standardized framework tailored to the shell department. The programming will be tailored based on the specific geometry and complexity of the parts involved, ensuring optimal efficiency and precision in production processes. Material / Robot programming 2 6 Months

Engineering PUR17 Stainless Steel Foundry Cooling Parameters Control Development of Cooling Parameters using Design of Experiments in Stainless Steel Foundries. Database creation 1 6 Months

Supply Chain PUR18 Supply and inventory management Develop an efficient system for demand forecasting and inventory optimization to minimize costs and ensure product availability. Leverage advanced forecasting methods and inventory models to determine optimal order quantities and timing. Inventory management

Procurement management

Transport management 1 6 Months